PROJECT DESCRIPTION
Dismantling the hoarding board using specialised labour and machineries including Telescopic cranes, Hydra. JCB/Excavator, fippers and trailer required for the procedure along with coordinating with the Central Railway authority and obtaining necessary permissions/Nocs, payment of the requisite charges for obtaining permission to conduct works in the railway premises and also payment of charges for obtaining railway block of the said stretch, as the hoarding is very near to the Railway track
In coordination with MCGM & 7raffic Police Division and obtaining permission to allow the movement of machinery/trailer required for dismantling of the hoarding board. The dismanfled material is to be shifted to the Railways designated Scrap Yard at Hazi bunder, trailer will be escorted by RPF under supervision of SSE Kurla (Wks). All works should be hich' completed in adherence of Safety and environmental nc›rrns in such a may that the safety of nearby habitants and Rly passenger at any point Shall nof be compromised at ony stage of the execution.
- Client: Mumbai Metro Line GeneraL Consultant
- Architect: Narendra.T
- Builder: KAPA PROJECTS LLP
- Project Size: INR 16 Crores